Sunday, November 18, 2018

Run Red Run: Engine Work

Swapped out the worn cam roller for a good new one. 

Also added the new +0.25 oil ring to the P1 piston. 




Saturday, November 3, 2018

Odd Jobs: Tires, Mufflers, New Frame


Miscellaneous odd jobs:

  • Unbox the misc bits and bolts from Ebay.  Score a roller, engine bolts, clutch lifter and some decent screws and bolts.  All the 5mm screws were JIS!
  • Tire pressure to 30 for all 4 bikes
  • Unbox the new muffler and finally make one good one for Red (no baffle)
  • Revisit the engine guard for Ivy.  Marked off the section that would need to be cut down so that it doesn't hit the muffler.
  • Unbox the new blue frame (but didn't unwrap it)